Delivered as a full civil and structural development supporting multi-product storage operations.
Delivered as a full civil and structural development supporting multi-product storage operations.

Delivered as a full civil and structural development supporting multi-product storage operations.
Challenge
Strategically located within a key logistics corridor, this 32,000 sq.ft. warehouse required a structurally robust and highly adaptable design capable of accommodating diverse product categories and dynamic loading conditions.
Site Preparation & Earthworks
The project commenced with soil testing, excavation, and compaction works to establish a stable formation level for foundation construction.
Ground engineering included:
Foundation & Substructure
The foundation system comprised reinforced concrete pad and pedestal foundations designed for heavy structural loads.
Works included:
Industrial Flooring
The floor slab was engineered for static equipment loading and long-term durability.
The slab construction included:
Structural Steel Superstructure
The superstructure was executed using a Pre-Engineered Steel Portal Frame system optimized for medium-span industrial storage.
Structural elements included:
Roofing & Thermal Performance
The roofing assembly was engineered for tropical heat and heavy rainfall exposure.
The roof build-up included:
Complete construction lifecycle executed under single contract.
Cladding & Completion
The building was fully enclosed using corrosion-resistant wall cladding supported by C-girts, incorporating ventilation provisions and secure access openings.
This project clearly demonstrates full lifecycle civil and structural construction delivery.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
contact@ujpsconstruction.lk
0701226888
NO.333/2 Negombo Road, Wattala
Get updates, tips, and industry news delivered to your inbox