This regional warehouse was delivered as a complete civil and steel construction project to be used as an logistics center.
This regional warehouse was delivered as a complete civil and steel construction project to be used as an logistics center.

This regional warehouse was delivered as a complete civil and steel construction project to be used as an logistics center.
Challenge
Although smaller in scale, this regional logistics center demanded the same structural integrity and as the larger projects completed but was optimized within a compact and cost-efficient footprint.
Site Development
Foundation & Slab
Industrial Flooring
The floor slab was engineered for static equipment loading and long-term durability.
The slab construction included:
Structural Steel Superstructure
The superstructure was executed using a Pre-Engineered Steel Portal Frame system optimized for medium-span industrial storage.
Structural elements included:
Roofing & Thermal Performance
The roofing assembly was engineered for tropical heat and heavy rainfall exposure.
The roof build-up included:
Complete project scope was delivered from foundations to roofing system installation.
Cladding & Completion
The building was fully enclosed using corrosion-resistant wall cladding supported by C-girts, incorporating ventilation provisions and secure access openings.
This project clearly demonstrates full lifecycle civil and structural construction delivery.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
contact@ujpsconstruction.lk
0701226888
NO.333/2 Negombo Road, Wattala
Get updates, tips, and industry news delivered to your inbox